EasyManua.ls Logo

Painless Performance 10309 - Page 92

Painless Performance 10309
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86
#1) Splicing- This is when you connect multiple wires to a single wire to distribute
power/ground to multiple components. In this case, splice off the #935 wire and running
wires to several gauges to provide power to each gage.
#2) Chaining or Jumpering- Run the #935 wire to a power post, before terminating the
wire with the proper terminal, you will insert another wire into the terminal and crimp.
You will now have 2 wires in one terminal. This additional wire will then route to the
power post on another gauge. Before terminating that wire with the proper terminal, you
will insert another wire into the terminal; and so on.