61
2. Before welding process make sure that all gas is evacu-
ated from the system, shake the compressor to evacuate
last remnants of gas. (You can blow air from the service
tube.)
*** Do not perform any operations for min 30 minutes
after you break the service tube.
3. Cut the capillary tube from the bottom of dryer.
4. Detach the dryer from the main tube using oxygen weld-
ing
After replacement of Fin Evap Assy, or Fin evap (only)
or Defrost heater, apply below instructions for
recharging.
5. Cut the end of capillary tube with the capillary scissor with
an angle of 45 °.