17 Procedure for checking of the major P.C.B.
17.1. Checking the DVD Module P.C.B., CD Loading P.C.B. and Main P.C.B.
Preparation
Follow items 16.1 to 16.12 of Disassembly Procedure (Refer to below diagram for service position 1).
17.2. Checking ASP P.C.B., Front Panel A P.C.B., Front Panel B P.C.B. &
Power P.C.B.
Preparation
Follow items 16.1 to 16.12 of Disassembly Procedure (Refer to below diagram for service position 2).
69
SA-HT833VP