SMARTZONE G5 INSTALLATION MANUAL
Before You Begin
Overview
This document provides installation instructions and configuration instructions to
qualified personnel for installing a Panduit Metered, Switched, and Metered & Switched
Power Distribution Unit (PDU) into a datacenter rack. Please read all instructions before
operating the equipment and save this manual for future reference.
Important Safety Information
See the complete regulatory compliance notices in Safety and Compliance Information
for Server, Storage, Power, Networking, and Rack Products on the Panduit website
(http://www.panduit.com/). In addition, follow the safety precautions that are specific to
this device.
This PDU is intended only for Information Technology Equipment (ITE) loads with
linear/Power Factor Corrected (PFC) input current. If non-linear loads are connected,
the nameplate current rating of the PDU must be reduced by a factor of 0.8.
WARNING: A risk of personal injury from electric shock and hazardous energy levels
exists. The installation of options and routine maintenance and service of this product
must be performed by individuals who are knowledgeable about the procedures,
precautions, and hazards associated with AC power products.
IMPORTANT SAFETY INSTRUCTIONS-----SAVE THESE INSTRUCTIONS
Follow these safety precautions when connecting multiple hardware components to
power sources.
WARNING: To reduce the risk of fire, electric shock and damage to the equipment:
HIGH LEAKAGE CURRENT. To reduce the risk of electric shock due to high leakage
currents, ensure that there is a reliable grounded (earthed) connection before
connecting power distribution products to AC power. If a large number of products
will be connected to a single PDU, it may be necessary to conduct an evaluation of
the installation to verify the total amount of leakage current. The total combined
leakage current should not exceed 5 percent of the input current for the PDU and