10
Pilot Operated Prop. DC Valve with VCD
 ®
Series D*1FP/FE Explosion Proof
Operation Manual
Parker Hannifin Corporation
MSG11-5715-718 D_1FP IECEX UK.indd 19.12.19
3. Safety Instructions
Read the operating instructions thoroughly before 
installation, commissioning, maintenance, repair 
and storage, and observe them. Failure to observe 
the operating instructions may result in damage to 
the valve or the parts of the system connected to 
it.
In particular, in the case of explosive atmospheres, 
any failure to observe the operating instructions 
may result in an explosion.
The system operator must make these operating 
instructions visible and easily accessible to ope-
rating and maintenance personnel.
Compliance with applicable standards/legal requi-
rements must be enforced. This particularly applies 
to plant safety and environmental protection.
A list of such standards, etc. appears in the annex 
by way of example.
Before starting installation, maintenance and repair 
work, the hydraulic system must be depressurized 
and power must be disconnected from the elec-
trical installation.
In addition, the electrical installation must be secu-
red so that power cannot be restored unexpected-
ly.
The valve may become hot during operation. To 
avoid risk of burns, do not touch the valve surface.
The system operator must monitor both the am-
bient temperature as well as the uid temperature 
and cool the oil if necessary in order to the keep 
within the maximum temperatures set out in these 
operating instructions (see technical data). In this 
connection, observe the relevant directions in the 
operating instructions of the supplier (solenoid 
system).
Any leaks occurring at the valve must be rectied 
immediately.   
Symbols
This manual uses symbols which have to be followed 
accordingly:  
 Instructions with regard to the warranty
    
  Instructions with regard to possible damaging 
of the valve or linked system components
  Notes relating to potential hazards
  Helpful additional instructions
  
Marking, name plates
Information attached directly to the valve such as 
circuit plans and name plates must be observed 
and kept in a legible state. 
Work on the valve
Work relating to the installation and commissioning 
of the valve may only be carried out by qualied 
persons. Qualied persons are dened as persons 
who, on the basis of education, experience and 
instruction, have sufcient knowledge of applicable 
requirements and accepted rules of the technolo-
gy.
Throughout any installation, commissioning, main-
tenance and repair work, it is the responsibility of 
the operator to ensure that there is no risk of ex-
plosion.
Before starting such work, the operator has to 
ensure that tools and equipment are only used if 
they do not damage the valve and they do not 
leave behind residues that are inammable.
In addition, clean the valve before starting such 
work, in particular removing dust, liquids and other 
deposits. Cleaning should be done using a lint-free 
cloth.
Tools may not be used if they might cause a static 
charge on use.
 Throughout any installation, commissioning, 
maintenance and repair work, it is the respon-
sibility of the operator to ensure that there is 
no risk of explosion.
Before removing the valve the hydraulic 
system must be depressurized and power 
must be disconnected from the electrical 
installation.