EasyManua.ls Logo

Parker Helac PowerTilt Series - Cross Port Relief Valve Installation

Parker Helac PowerTilt Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PowerTilt Tilting Coupler
PowerTilt Series Service & Repair Manual
HY34-1410
49
Parker Hannifin Corporation
Helac/Cylinder Division
Enumclaw, Washington USA
www.parker.com/helac
6. Now make an alignment mark between the
lock ring (05) and shaft (02) splines. Then
remove the lock ring.
End Cap Torque Specifications
1. Reinstall the cross port relief valve (413) with
new O-rings and back up rings and torque to
60 Nm.
2. Coat the shaft port plug (101) threads with
Loctite 242 and install into the end of the
shaft (02) and torque to 305 Nm.
Model Torque (Nm) Hydraulic Pressure (bar)
4.5 135–150 35–40
06 475–680 35–40
07 750–910 35–40
08 1360–1630 40–45
09 1770–2175 35–40
10 2210–2650 35–40
11 2780–3330 35–40
12 3500–4200 35–40
Assembly
End Cap and Lock Ring Installation
Cross Port Relief Valve Installation

Related product manuals