32 | P a g e
To use this dialog, for each weekday choose the schedule it should be paired with and then close the
dialog with OK. The calendar then updates to make these weekday-schedule pairings. Using the Quick
setup can make it easier to work with the calendar by performing the majority of assignments for you
and then you can use the selection method to change the assignments for specific days.
Working with schedules in UPStart when not connected to the Gateway
As described above, the schedule is stored in the Gateway memory and also stored in the UPStart UPB
file. Being stored in two places has the potential to have conflicts between the two. For example, a
schedule in the UPB file schedules a scene at 10pm and the schedule in the Gateway schedules that
same scene at 11pm. This could happen if the schedule was initially configured using UPStart and then
later changed using one of the remote applications.
UPStart helps out in these ways:
1. When not connected to the Gateway and you start editing a schedule this warning appears.
This message reminds you that you are editing the schedule as it appears in the UPB file but
that may not be what is stored in the Gateway.
2. When not connected to the Gateway and you complete an edit of the schedule and you made
changes, then this warning appears:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PCS PulseWorx Gateway and is the answer not in the manual?

PCS PulseWorx Gateway Specifications

General IconGeneral
BrandPCS
ModelPulseWorx Gateway
CategoryControl Unit
LanguageEnglish