PELLENC POWER TOOLS BATTERY 150
56_158889-A
4.6. PUTTING THE LEAD AND WRIST STRAP IN PLACE
1. Put on the belt then clip the battery to it and in-
stall the connected tool in the holster, see Sec-
tion 4.4, “Fitting the holster to the belt” and Sec-
tion 4.5, “Tool connection”.
2. Put the armband (1) around your arm.
3. Insert the tool power cord (2):
• in parallel if it is to slide into the armband clip (3);
• perpendicularly if it is to be attached in the arm-
band clip (3).
14