EasyManua.ls Logo

Pentair Fleck 4650 - WATER CONDITIONER FLOW DIAGRAMS; Service Position; Preliminary Rinse Position; Backwash Position

Pentair Fleck 4650
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WATER CONDITIONER FLOW
DIAGRAMS
1 Service Position
Hard water enters the unit at the valve inlet - ows around the
lower piston groove - thru the passage to the top of tank - down
thru the resin and enters the distributor as conditioned water.
The conditioned water ows up thru the center tube to the
valve outlet.
2 Preliminary Rinse Position (5 Minutes)
Hard water enters the unit at the valve inlet - ows around
the lower piston groove - down thru the top of tank passage
- downward thru the resin - up the distributor tube - thru the
center hole in the piston - over the top edge of the piston and
out the drain line.
3 Backwash Position (10 Minutes)
Hard water enters the unit at the valve inlet - ows around
the lower piston groove and lower piston land - down thru the
center tube and out the distributor - up thru the resin - thru the
top of tank passage - around the upper piston groove and out
the drain line.
4 Brine Position (First Portion of 50 Minute Fixed Cycle)
Hard water enters the unit at the valve inlet - ows around the
lower piston groove - thru the injector nozzle and orice to
draw brine from the brine tank. The brine ows down thru the
resin - into the distributor - up thru the center tube - thru the
center hole in the piston and out the drain line.
Fleck 4650 AP10 • 5

Related product manuals