EasyManua.ls Logo

Pentair FLECK 5600SXT - Job Specification Sheet

Pentair FLECK 5600SXT
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
JOB SPECIFICATION SHEET ...............................................2
INSTALLATION .....................................................................3
START-UP INSTRUCTIONS..................................................3
TIMER FEATURES ................................................................4
TIMER OPERATION .............................................................. 5
MASTER PROGRAMMING MODE CHART ............................6
MASTER PROGRAMMING MODE .........................................7
USER PROGRAMMING MODE............................................10
DIAGNOSTIC PROGRAMMING MODE ................................ 10
CONTROL VALVE ASSEMBLY ............................................ 12
VALVE POWERHEAD ASSEMBLY ......................................14
3/4-INCH TURBINE METER ASSEMBLY ..........................15
3/4-INCH PLASTIC PADDLE METER ASSEMBLY .............15
BYPASS VALVE ASSEMBLY (PLASTIC) ..............................16
BYPASS VALVE ASSEMBLY (METAL) ................................17
2300 SAFETY BRINE VALVE ..............................................18
2310 SAFETY BRINE VALVE .............................................19
TROUBLESHOOTING ..........................................................20
WATER CONDITIONER FLOW DIAGRAMS .........................22
WIRING DIAGRAM ..............................................................23
SERVICE INSTRUCTIONS ..................................................24
FLOW DATA & INJECTOR DRAW RATES ..........................26
SERVICE ASSEMBLIES ......................................................27
JOB SPECIFICATION SHEET
Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. Time Clock
B. Meter Initiated
2. Downflow: Upflow Upflow Variable
3. Meter Size:
A. 3/4-inch Turbine
B. 3/4-inch Paddle Wheel
C. Electronic ____Pulse Count ___ Meter Size ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or
Delayed Regeneration
B. System #4: Time Clock
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control: gpm
7. Brine Line Flow Controller: gpm
8. Injector Size#:
CALIFORNIA PROPOSITION 65 WARNING
WARNING:
This product contains chemicals known to
the State of California to cause cancer or
birth defects or other reproductive harm.
2FLECK
5600SXT Downflow Service Manual

Related product manuals