EasyManua.ls Logo

Pentair Goyen IS Series - Step 6: Connect Interface Module; Step 7: Inspect Connections; Step 8: Power Up and Settings Check; Step 9: Test Performance

Pentair Goyen IS Series
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 8
Power up and check settings
STEP 9
Test performance – Run cycle
Inspect all connections
Replace covers before applying power. For the ATEX approved enclosures,
tighten cover screws at 1.5 N.m.
When replacing existing Ex blanking plugs, tighten at:
M20 – 1.7 N.m
M25 – 2.3 N.m
When replacing the existing dP fitting, tighten at:
dP fitting – 5 N.m
Tube fastening nut – 0.5–0.75 N.m
STEP 7
STEP 6
Connect Interface Module
6/56
©COPYRIGHT Goyen Controls Co. Pty. Ltd.
PRODUCT INSTALLATION INSTRUCTIONS
GOYEN IS/ISP SERIES CONTROLLER
DEINE-012
ENGLISH

Related product manuals