Mounting and commissioning the machine
8 - 5
8.03 Start inhibitor
8.03.01 Mounting the start inhibitor
Set the machine into the table top.
After loosening screws 2, set switch 1 so
that it is activated when the sewing head
is in an upright position.
In this position tighten screws 2.
8.03.02 Checking the start inhibitor function
Switch the machine on at the main switch and tilt back the sewing head.
The error message "E9" must appear on the control panel.
If the message does not appear, check the setting of safety switch 1.
Set the sewing head upright and acknowledge the error message by pressing the TE/
Speed
key. The machine is ready for operation again.
E9
ERROR
Fig. 8 - 07
1
2