EasyManua.ls Logo

Pfaff 1171

Pfaff 1171
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting and commissioning the machine
8 - 7
8.06 Switching the machine on/off
Switch the machine on (see Chapter 7.01 On/Off switch).
8.05 Commissioning the machine
Check the machine, especially the
electrical leads, for any damage.
Clean the machine thoroughly (see
chapter 10 Care and maintenance).
Have specialists ensure that the
machine’s motor can be operated with
the available electricity supply and that it
is connected properly. If not, the machine
must not be operated.
Before commissioning the machine,
remove grommet 1 of oil container 2.
Grommet 1 is only needed for
support during transportation
and must not be used while the
machine is in operation.
Fig. 8 - 08
1
2

Table of Contents

Related product manuals