EasyManua.ls Logo

Pfaff expression 2038

Pfaff expression 2038
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2:5
B
A
C
Preparations
Winding from the second spool pin
Insert the second spool pin in the hole provided.
Threading
Thread as shown on page 2:4.
Switch on the main switch
Hold the end of the thread rmly and press the foot control. As
soon as the bobbin is full, the winding action will be stopped
automatically. Cut the thread, push the bobbin to the left and
remove bobbin from the winder.
Bobbin door
Switch off the main switch
Hold the bobbin door (46) at the left side and open it towards
the front.

Table of Contents

Related product manuals