7
SHIFT 2
SHIFT 2 air
GETTING STARTED
PREPARATIONS
• The Evolv Shift 2 case is designed to support installation in a standing position.
• Don’t turn on the power to your system until installation is complete.
• Discharge your body’s static electric charge by touching a grounded surface before performing any hardware procedure.
• Make sure to consult the manuals of your hardware before installation.
RECOMMENDED INSTALLATION PROCESS
A unique chassis design like the Shift 2 (air) comes with a dierent approach to the installation process.
That is why we recommend to follow these installation tips:
- Follow the component installation order as shown in this manual.
- Pre-route the cables for each installed component as shown at each step.
- Wait with connecting cables until the end of the installation process.
Depending on hardware components such as power cable length the cable routing can be dierent.
1. INSTALL COMPONENT 2. PRE-ROUTE CABLES
TO THE OUTSIDE
3. CONNECT ALL CABLES AT THE END
OF THE INSTALLATION PROCESS