EasyManua.ls Logo

Pit Boss PB757GD - Mounting the Control Knobs; Placing the Grease Cup; Expanding the Side Shelves; Set-Up for Gas Cylinder

Pit Boss PB757GD
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
9.    
Installation:
• Drop the upper gas cylinder hook into the correct position for usage.
Note steps as shown in illustration 9A.
• Unfold the lower gas cylinder bracket into the correct position for
usage. Note steps as shown in illustration 9B.
• The unit is now completely assembled.
8.    
Installation:
• Unlock the front latch. Unfold the side shelves to expose the hot plate
for usage.
6.    
Parts Required:
4 x Control Knob
(#4)
Installation:
• Mount each Control Knob to the front panel of the unit.
7.    
Parts Required:
1 x Grease Cup
(#3)
Installation:
• On the front of the unit, place the Grease Cup into the Grease Cup
housing, as shown in the illustration.
7
6
9
9
8
4
4
4
4
3