EasyManua.ls Logo

PL Engineering Z-Meter DX4091 - Page 38

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PL Engineering Ltd Z-Meter DX4091/ User Guide
page 38 of 44 ver.1.02 (2022)
Clicking this button will add the updated measurement result to the
report with the specified changes.
Go to «History»
You can see that updated results are stored.
Repeat measurements with another sample
Note that there is a pause about 20 seconds between measurement
cycles. It needs to cool down of sample after polarity measurements
(pellet sample is heated slightly).
During this pause the «Measure» button is automatically blocked and
at the Status Line one can see a brief message – «Waiting for …».