EasyManua.ls Logo

Polaris Automatic Gate Operators 500 Single - Primary;Secondary Gate Movement Timing

Polaris Automatic Gate Operators 500 Single
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page
26
PRIMARY/SECONDARY GATE
MOVEMENT
For dual gate installations the timing of the
gates opening and closing can be adjusted. To
set a dual gate installation for both gates to
open and close simultaneously, set the DIP
switches as follows.
Block 2, DIP 1 ON position
Block 2, DIP 4 OFF position
If it is desired to have one gate open and close
prior to the other, this can be accomplished by
adjusting the DIP switch settings.
Block 2, DIP 1 ON position
Block 2, DIP 4 ON position
Now determine which gate is desired to open
first and close second. Another DIP switch
adjustment is required to set this.
For primary gate operator (wired to operator 1
terminals) to open first and close second:
Block 2, DIP 5 OFF position
For secondary gate operator (wired to operator
2 terminals) to open first and close second:
Block 2, DIP 5 ON position
The delay in opening and closing is always set
for two seconds.
PRIMARY/SECONDARY GATE
MOVEMENT
Control Box Cover
Once you have programmed your
remote/keypad, you can then install the cover
of the control box. Use five #10 x 3/4” screws to
secure the cover to the control box.

Related product manuals