EasyManua.ls Logo

Primex BC100 - Page 20

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Multi-floor | Smart-Sync Bridge on each floor
General guidelines
l A single Smart-Sync Bridge installed on each floor.
l The single floor general guidelines apply per floor.
l Avoid installing the Smart-Sync Bridges in a vertical column above each other - stagger the bridge installation locations across
the multiple floors.
l If a clock fails to set its time, measure the Bluetooth signal strength at an installation location. This determines if the location has
adequate Bluetooth signal strength, resulting in no coverage gap.
Ideal deployment illustration
20