EasyManua.ls Logo

Profitec PRO300 - Transport and Warehousing; Packing

Profitec PRO300
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bedienungsanleitung PRO300 / Instruction manual PRO300 25
The steam nozzle is blocked
Clean the holes of the steam nozzle carefully with a needle or with a paper clip.
For this purpose, the steam nozzle may be unscrewed as well.
Important
Do not lose the small gasket situated between the steam nozzle and the thread!
Afterwards replace the steam nozzle.
8 TRANSPORT AND WAREHOUSING
8.1 Packing
The PRO300 is delivered in a special carton and protected by a plastic cover and foam.
Caution!
Keep packing out of the reach of children!
Important
Keep packing and packing material for possibile transport! Do not throw it away!
8.2 Transport
Transport the machine only upright, if possible on a pallet.
Do not tilt or turn the machine over.
Do not stack more than three units on top of each other.
Do not place other heavy items on the packing.
8.3 Warehousing
Keep the machine packed in a dry place.
Do not stack more than three units on top of each other.
Do not place other heavy items on the packing.
9 DISPOSAL
WEEE Reg.-Nr.: DE 97592029
This product complies with EU Directive 2002/96/EC and is registered according to WEEE (Waste Electrical
and Electronic Equipment).
10 CE CONFORMITY
Conformity
The product complies with the following EU Directives:
Machine: 2006/42/EC
Low Voltage: 2006/95/EC
EMC: 2004/108/EC
PED: 97/23/EC
EN-Directives: EN 292-1, EN 292-2, EN 60335-1, EN 60335-2-15 or EN 60335-2-75,
EN 55014, EN 61000-3, EN 61000-4, ENV 50141, EN 55104

Related product manuals