EasyManua.ls Logo

ProTeam PP10C - Connection

ProTeam PP10C
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
W interizing rain water from this valve.hen w d all
Heat Pump
When winterizing drain all water from this valve.
Pump
Pool
Inlet
Dosing equipment
Filter
Skimmer
1. Installation and Connection
1.2 Connection
Water flowing out of filter is divided by three valves: Some water is led to the Heat Pump
to be heated/cooled and then after being mixed with the water from the filter it is led
back to the pool.
Tandem Connection
This connection is used for 2 heat pumpscoupled .
from the filter
to the pool

Related product manuals