EasyManua.ls Logo

Proteco ELITE NEW 3 - User Manual

Proteco ELITE NEW 3
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
12_18
ELITE NEW
AUTOMATION FOR SWING GATES
Installation manual
Question and Answer IconNeed help?

Do you have a question about the Proteco ELITE NEW 3 and is the answer not in the manual?

Summary

General Safety Precautions

Intended Use and Application

Kit Contents

Details the components included in the double-leaf gate automation kit.

Technical Features

Operator Dimensions

Installation

Preliminary Checks

Ensures gate suitability, proper mechanical stops, free swing, and safe opening space.

Tools and Materials (Not Included)

Wiring Installation Overview

Installing the Operator

Quotes from Ground

Specifies optimal height for operator installation from ground level (40-50 cm).

Pillar Brackets - How to Determine Fixing Dimensions

Provides guidance on fixing bracket dimensions for a 90° opening angle.

Outward Opening

Instructions for configuring the gate automation for outward opening.

Pillar Bracket S1

Details on anchoring pivot bracket S1 to the pillar, including distance from edge.

Gate Bracket S3

Steps to determine bracket S3 position and affix it to the motor.

Manual Release

Maintenance

Warranty

Phasing Out and Disposal

Declaration of Conformity

Proteco ELITE NEW 3 Specifications

General IconGeneral
BrandProteco
ModelELITE NEW 3
CategoryGate Opener
LanguageEnglish

Related product manuals