EasyManua.ls Logo

PTW DIAMENTOR E2 - Connecting the Chamber and Printer and Putting into Operation; Mounting the Ionization Chamber

Default Icon
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIAMENTOR E2
First Time Operation
D651.131.00/05 en 15
4.3 Connecting the Chamber and
Printer and Putting into Operation
Always turn off the device before connecting or
removing peripheral devices.
Connect the chamber to 3 (refer to Figure 3).
Use the original cables from PTW (available in
various lengths up to 40 meters (130 ft)).
Socket SERIAL (Figure 3, item 1): Connect the
printer cable or RS232 interface cable for PC.
Turn on the DIAMENTOR E2 with the On/Off
switch (refer to
Figure 3, item 5). The firmware
version will be displayed for about 2 seconds,
followed by a display test. After completion of
the test the DIAMENTOR E2 is operational.
4.4 Mounting the ionization
chamber
General information
The DIAMENTOR E2 can be operated with every
PTW-DIAMENTOR chamber featuring connecting
system A (
Figure 3, item 3).
The chamber calibration factor must be entered for
the connected chamber (section
4.5). When replac-
ing the chamber, do not forget to enter the new
chamber calibration factor (section
4.5.)
The DIAMENTOR E2 connection cables are avail-
able in various lengths (max. 40 meters (130 ft.)).
Use only the original cables from PTW.

Related product manuals