EasyManua.ls Logo

Purkeys DIRECT PLUS - Routing Severe Service Cables

Purkeys DIRECT PLUS
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
DIRECT NOSEBOX INSTALLATION GUIDE
Step 1: Route the red and black
4-gauge cable toward the back of
the trailer via the center channel.
Secure with wire ties as you go.
Step 2: When near the ligate
battery box, route the two 4-gauge
red and black cables to the ligate
battery box. Again, secure the
cables with wire ties as you go.
Step 4: Mark how much excess will
need to be cut o of the 4-gauge
red and black cables so that the
4-gauge red cable will reach the
le (input) side of the 150 amp
circuit breaker and the 4-gauge
black cable will reach the ligate
battery negative post.
Important: Avoid sharp edges and possible chang points.
Routing the Severe Service Cables
Step 3: Determine if the pre-terminated cables are an appropriate length. If
they are, skip to Step 9.
If they are not the appropriate length, continue to Step 4. Use the supplied
hardware (BK-1055) to terminate the cables.

Other manuals for Purkeys DIRECT PLUS

Related product manuals