17
P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
DIRECT NOSEBOX INSTALLATION GUIDE
Step 1: Route the red and black
4-gauge cable toward the back of
the trailer via the center channel.
Secure with wire ties as you go.
Step 2: When near the ligate
battery box, route the two 4-gauge
red and black cables to the ligate
battery box. Again, secure the
cables with wire ties as you go.
Step 4: Mark how much excess will
need to be cut o of the 4-gauge
red and black cables so that the
4-gauge red cable will reach the
le (input) side of the 150 amp
circuit breaker and the 4-gauge
black cable will reach the ligate
battery negative post.
Important: Avoid sharp edges and possible chang points.
Routing the Severe Service Cables
Step 3: Determine if the pre-terminated cables are an appropriate length. If
they are, skip to Step 9.
If they are not the appropriate length, continue to Step 4. Use the supplied
hardware (BK-1055) to terminate the cables.