18
Step 5: Pull the 4-gauge red and
black cables back out of the battery
box so it is easier to work on them.
Cut o the excess.
Step 6: Strip 1/2 inch of the
insulation o the 4-gauge red and
black cables.
Step 7: Install the 1/4 inch ring
terminal on the 4-gauge red cable
and the 3/8 inch ring terminal
on the black cable. Crimp the
connections.
Step 8: Install the red heat shrink to
the crimp area of the red cable and
the black heat shrink to the crimp
area of the black cable. Apply
heat to both pieces to seal the
connection.