EasyManua.ls Logo

PVR EU 45 - Connection to the Machine; Discharge Air Pipe Line Installation

PVR EU 45
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating and maintenance instructions
EN
11
LI 718.06
5.3 Connection to the machine
The connection to the chamber to be pumped down must be carried out by means of
pipes of the same diameter as the inlet port.
Pipe weights and expansions, if any, must not rest on the pump.
It is advisable to make the final connection to the pump inlet port with flexible pipes or
fittings.
It is important that all the pipes and the dierent fittings are tight.
Very long or small diameter pipes decrease the pump performances.
This symbol identifies the inlet port.
For further information, please refer to the RDT attached herewith.
5.4 Discharge air pipe line installation
If the pump has been installed in a room with poor air exchange, it is possible to pipe
the pump discharge air to other rooms or outside.
Use pipes with the same diameter as the tank discharge port with a maximum length
of 15 m.
For longer pipes increase pipe diameter. Pipe weights must not rest on the pump.
In the final length use flexible pipes or pipe fittings.
NOTE:
this pipe must be descending, to avoid the condensate going back to the tank.
WARNING:
do not connect ball valves to this pipeline.
This symbol identifies the exhaust port.
For further information, please refer to the RDT attached herewith.

Related product manuals