EasyManuals Logo

Quantech QTC2015T User Manual

Default Icon
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
QUANTECH
FORM QTC2-eg1 (515)
64
PART 1 – GENERAL
1.01 SCOPE
A. The requirements of the General Conditions, Supplementary Conditions, Division 1,
and Drawings apply to all Work herein.
B. Provide Microprocessor controlled, multiple-scroll compressor, air-cooled, liquid chill-
ers of the scheduled capacities as shown and indicated on the Drawings, including but
not limited to:
1. Chiller package
2. Electrical power and control connections
3. Chilled water connections
4. Change of refrigerant oil (for factory mounted evaporator) or (evaporator shipped
separatelyforeldinstallationandpipingbycontractor)
1.02 QUALITY ASSURANCE
A. ProductsshallbeDesigned,Tested,RatedandCertiedinaccordancewith,andin-
stalled in compliance with applicable sections of the following Standards and Codes:
1. ANSI/ASHRAE Standard 15 – Safety Code for Mechanical Refrigeration
2. ASHRAE90.1–EnergyEfciencycompliance.
3. ANSI/NFPA Standard 70 – National Electrical Code (N.E.C.).
4. ASME Boiler & Pressure Vessel Code, Section VIII, Division 1.
5. AHRI Standard 550/590 – Positive Displacement Compressors and Air Cooled Ro-
tary Screw Water-Chilling Packages.
6. Conform to Intertek Testing Services, formerly ETL, for construction of chillers and
provide ETL/cETL Listing label.
7. Manufactured in facility registered to ISO9002.
8. OSHA - Occupational Safety and Health Act
B. Factory Test: Chiller shall be pressure-tested, evacuated and fully charged with refrig-
erantandoil,andshallbefactoryoperationalruntestedwithwaterowingthroughthe
vessel.
C. Chiller manufacturer shall have a factory trained and supported service organization
that is within a 50 mile radius of the site.
D. Manufacturer shall Warrant all equipment and material of its manufacture against de-
fects in workmanship and material for a period of one year from date of initial start-up
oreighteen(18)monthsfromdateofshipment,whicheveroccursrst.
Guide Specifications

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quantech QTC2015T and is the answer not in the manual?

Quantech QTC2015T Specifications

General IconGeneral
BrandQuantech
ModelQTC2015T
CategoryChiller
LanguageEnglish

Related product manuals