EasyManua.ls Logo

Radleys Reactor-Ready Lab Reactor - Page 48

Radleys Reactor-Ready Lab Reactor
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
Step 2
Connect one end of the tubing to the hose barb
on the elbow component.
Make sure it is secured tightly to avoid any
leakage.
Step 3
Place the spray lance in the B34 port of your
Reactor-Ready lid.
The B34 compression fitting will hold the lance in
place during operation.
Step 4
The height of the lance as well as the angle of the
nozzle can be adjusted by loosening the
compression fitting cap.
Step 5
If using the Spray Lance with a peristaltic pump,
place the middle part of tubing within the
peristaltic pump head and close the clamp.
Adjust the rpm settings to your desired speed
and tube diameter settings of the tubing. A flow
rate of 0.85 l/min is the minumium required to
give a spray pattern to cover the sides of the
vessel.
Step 6
Place the other end of the tubing into your
solvent container.
Make sure it is submerged sufficiently so that
solvent can pass through the tubing.
Step 7
For filtering applications the Bottom Outlet Valve
should be opened, for rinsing it should be closed.
Press start on the Peristaltic Pump to start the
spray lance.

Table of Contents

Related product manuals