6
3. MOUNTING THE CONTROL VALVE
1) Mount the motorized Control Valve in the main hose line between the Flow Meter and the booms,
with motor in the upright position. (For flow less than 3 GPM [11 lit/min] the motorized Control Valve
is mounted in a by-pass line. Refer to Appendix 3 for alternate plumbing diagram).
2) Connect the Flow Control Cable connectors to boom valves, Flow Meter, Pressure Sensor and
motorized Control Valve. (Black wire to boom valve #1, Brown wire to boom valve #2, Blue wire
to boom valve #3, Blk/Wht wire to boom valve #4, Brn/Wht wire to boom valve #5, Blu/Wht wire to
boom valve #6 and Wht/Blk to boom valve #7). Flow Meter extension cables are available from
your dealer.
4. MOUNTING THE TIER DRIVER INTERFACE BOX
1) Mount the Tier Driver Interface box close to the air valve bank(s) that will drive the nozzle tips.
2) Connect the Flow Control Cable and Boom/Tier Driver Cable to the Driver Interface Box.
3) Connect the Boom/Tier Driver Cable terminals to the appropriate air valves as seen in Table 1.
TABLE 1. BOOM/TIER DRIVER CABLE TERMINAL CONNECTIONS
MATES TO AIR VALVE FUNCTION
1 WHITE BOOMS 1 AND 2 TIER GND
2 WHT/GRY BOOMS 3 AND 4 TIER GND
3 GRAY BOOMS 5, 6, AND 7 TIER GND
4 BLACK BOOM 1 - TIER A SIGNAL
5 GREEN BOOM 1 - TIER B SIGNAL
6 YELLOW BOOM 1 - TIER C SIGNAL
7 LIGHT BLUE BOOM 2 - TIER A SIGNAL
8 BROWN BOOM 2 - TIER B SIGNAL
9 ORANGE BOOM 2 - TIER C SIGNAL
10 VIOLET BOOM 3 - TIER A SIGNAL
11 WHT/BLK BOOM 3 - TIER B SIGNAL
12 WHT/RED BOOM 3 - TIER C SIGNAL
13 WHT/GRN BOOM 4 - TIER A SIGNAL
14 WHT/YEL BOOM 4 - TIER B SIGNAL
15 WHT/BLU BOOM 4 - TIER C SIGNAL
16 WHT/BRN BOOM 5 - TIER A SIGNAL
17 BLK/WHT BOOM 5 - TIER B SIGNAL
18 BLU/WHT BOOM 5 - TIER C SIGNAL
19 BRN/WHT BOOM 6 - TIER A SIGNAL
20 BLU/YEL BOOM 6 - TIER B SIGNAL
21 GRN/YEL BOOM 6 - TIER C SIGNAL
22 PINK BOOM 7 - TIER A SIGNAL
23 YEL/WHT BOOM 7 - TIER B SIGNAL
24 DARK BLUE BOOM 7 - TIER C SIGNAL