Do you have a question about the Raven SCS 460 and is the answer not in the manual?
Brand | Raven |
---|---|
Model | SCS 460 |
Category | Control Systems |
Language | English |
Covers defects in workmanship or materials under normal use, maintenance, and service.
Coverage runs for 12 months from the purchase date of the product.
Return the defective part with proof of purchase to your local dealer.
Raven Industries will repair or replace the defective part at their option.
Excludes damages from misuse, abuse, accident, or improper installation and maintenance.
Converts meter calibration numbers for different display units like Fluid Ounces or Liters.
Provides conversion factors for various liquid measurements (Gallons, Ounces, Liters).
Defines standard length units and their conversions (mm, cm, m, inch, feet).
Defines standard pressure units and their conversions (PSI, kPa).
Defines standard area units and their conversions (sq meter, hectare, acre).
Guides for attaching the radar speed sensor to the vehicle frame, ensuring proper line of sight.
Instructions for installing the Flow Meter and Pressure Sensor on the sprayer system.
Details for mounting the motorized control valve in the main hose line between the Flow Meter and booms.
Procedure for mounting the tier driver interface box close to the air valve banks.
Steps to securely mount the console inside the vehicle cab and connect all system cables.
Determines boom widths in inches [cm] for broadcast or band spraying applications.
Refines the speed sensor calibration number based on vehicle movement over a measured distance.
Instructions to record the Flow Meter calibration number stamped on its tag.
Details how to set valve control parameters like speed, backlash, and brake point.
Determines application rates based on pressure, speed, and nozzle spacing.
First-time setup for system units, speed sensor type, and valve driver selection.
Details various console settings: rate faults, alarms, data logging, tier control, and data lock.
Procedure to enter the estimated liquid volume in the tank for tracking.
Configures the system clock, date, and power down delay settings for operation.