EasyManua.ls Logo

Real Flame LANDSCAPE BALANCED - Timber Frame Installation Procedure; Step 1: Base Construction; Step 2: Unit Placement and Connections

Real Flame LANDSCAPE BALANCED
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LANDSCAPE MODEL (continued)
Timber Frame Installation Procedure
Step 1
Construct the base for the unit. Ensure base is adequate for the weight of the fire.
Step 2
Call for delivery of the unit, position on the base and fit off gather, flues and termination. Connect
gas and power.
FLUE
GATHER
GAS
POWER
Termination outside
(Horizontal shown)
C
Vertical Termination
Base of unit to
centre of flue
1000 = 1695
1600 = 1637
Back of unit to
centre of flue
(Excluding 25mm
standoff)
1000 = 160
1600 = 122
10

Related product manuals