EasyManua.ls Logo

Real Flame LANDSCAPE BALANCED - Timber Frame Installation Procedure (continued); Step 3: Frame Construction and Clearances; Step 4: Plastering and Finishing; Step 5: Commissioning the Fire

Real Flame LANDSCAPE BALANCED
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LANDSCAPE MODEL (continued)
Timber Frame Installation Procedure
Step 3
Construct the frame
around the fire as per
drawing, taking note of
required clearances.
(See page 12)
Step 4
Sheet plaster and finish
remembering to run plaster
beyond stud and behind trim.
Step 5
Commission fire as per
page 14.
TRIM
PLASTER
11

Related product manuals