©2019, REC TEC Industries, LLC
Questions? CLICK for support!
Air Box
Assembly
Back to Table of Contents
17
Initial Setup
Procedure
Tip: If you are planning on using your grill right away, save
time and begin your initial burn in here. Finish installing the
inner components while the grill begins to heat up.
BE CAREFUL NOT TO DAMAGE THE TEMPERATURE
SENSOR WHILE INSTALLING INTERNAL COMPONENTS.
Insert drip pans (#16) with
notch side slanting toward
drip bucket spouts on the
left and right sides.
Install Internal Components
Lift lid and install the ame deector
(#20) over the air box assembly
with the small notches in the ame
deector over the small tabs located
at the inside front and the large
cutout to the rear of the grill body.
Tip: Many customers
line their drip pan with
aluminum foil for easier
clean up.
Make sure to leave
equal gaps between
the drip pan and front
and back chamber
walls to ensure even
heat distribution.
When lining drip pan,
keep foil inside drip
pan edges and DO NOT
wrap around. This can
restrict airow.