EasyManua.ls Logo

Reer MOSAIC M1 - Checklist after Installation

Reer MOSAIC M1
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16 8540797 02 • 18/03/2021 • Rev.1
MOSAIC M1 - MASTER MODULE
English
CHECKLIST AFTER INSTALLATION
The MOSAIC system is able to detect the faults that occurs in each own
module.
Anyway to have the system perfect operation perform the following checks
at start up and at least every one year:
OPERATION / CONTROL
COMPLETE
1. Verify the correct fixing of MOSAIC to the Omega rail
2. Operate a complete system TEST
(see "TESTING the system", in the Mosaic instruction manual
available on the ReeR website)
3. Verify that all the cables are correctly inserted and the terminal
blocks well screwed
4. Verify that all the leds (indicators) light on correctly
5. Verify the positioning of all the sensors connected to MOSAIC
6. Verify that all the external indicators (lamps) work properly

Other manuals for Reer MOSAIC M1

Related product manuals