Rev 3.1 28 | P a g e
4.11 Examination Checklist Form
Frog XT4 Examination Checklist
Avg. No of Transfers /
Year
Original Inspection record
filed in
Comment / Serial Number/
Colour Code
Wire Rope Lifting Assembly (Critical Part) (Consumable)
Replace the wire rope lifting assembly according to the usage of the FROG. This may be as
frequently as every 3 months. Irrespective of apparent condition the lifting assembly should
be replaced at least every 12 months.
Load Plate Safety Bolts (Critical Part) (Consumable)
Remove and visually inspect the 4 safety bolts for any signs of damage or strain. Visually
inspect the 4 holes in the 2 central columns for signs of damage or strain. Replace
appropriate parts according to the usage of the FROG XT or on the recommendation of a
Competent Person / Inspector.
Load Plate (Critical Part)
Remove and visually inspect the main Load plate for any signs of damage or strain. Replace
on the recommendation of a Competent Person / Inspector.
Node Plate Safety Bolts (Critical Part) (Consumable)
Remove and visually inspect the 4 safety bolts for any signs of damage or strain. Visually
inspect the 4 holes in the 2 central columns for signs of damage or strain. Replace
appropriate parts according to the usage of the FROG XT or on the recommendation of a
Competent Person / Inspector.