EasyManuals Logo

Reflex EZ-TRAC Field Guide

Reflex EZ-TRAC
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
Downhole survey
11. The BHA (Wedge/Motor) can now be run into the
hole to depth, and the survey instrument can be
prepared for the orientation survey.
Note: REFLEX™ EZ-COM will hibernate if not used
for 2 minutes. Press the ON button to continue.
12. Highlight INIT, point the IR ports at each other and
press OK.
13. Run the instrument into the BHA via wireline.
MEASURE is highlighted. Once the instrument is in
position, press OK to take the shot.
16

Other manuals for Reflex EZ-TRAC

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Reflex EZ-TRAC and is the answer not in the manual?

Reflex EZ-TRAC Specifications

General IconGeneral
BrandReflex
ModelEZ-TRAC
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals