EasyManua.ls Logo

Reflex EZ-TRAC - 3 ABOUT SURVEYING; 3.1 All boreholes deviate; 3.1.1 Calculation of underground positions; 3.2 Direction of downhole object

Reflex EZ-TRAC
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. a) A confirmation screen will appear. If the
information is correct, highlight INIT (initialize).
The IR port on the REFLEX™ EZ-COM must now
be pointed at the IR port on the survey instrument.
Press OK. (There is no need to set a survey time.)
b) If the information is incorrect, highlight BACK
and press OK. Keep going back until you reach
the information that is incorrect.
9. Pull back 6 meters. Assemble the instrument and
lower through the bit face. Ensure the landing collar
is sitting in the bit face.
10. Allow 30 seconds for the instrument to settle.
MEASURE is highlighted; press OK to take the shot.
Note: REFLEX™ EZ-COM will hibernate if not used
for 2 minutes. Press the ON button to continue.
3

Other manuals for Reflex EZ-TRAC

Related product manuals