Home
REMEHA
Boiler
Quinta Ace
REMEHA Quinta Ace User Manual
5
of 1
of 1 rating
80 pages
Give review
Manual
Specs
To Next Page
To Next Page
Loading...
United Kingdom
en
Installation, user and service manual
High-efficiency wall-hung gas boiler
Quinta Ace
160
2
Table of Contents
Default Chapter
3
Table of Contents
3
1 Safety
6
General Safety Instructions
6
Recommendations
8
Specific Safety Instructions
9
Additional Guidelines
9
Liabilities
10
Manufacturer's Liability
10
Installer's Liability
10
User's Liability
10
2 About this Manual
11
General
11
Additional Documentation
11
Symbols Used
11
Symbols Used in the Manual
11
Abbreviations
11
3 Technical Specifications
12
Homologations
12
Certifications
12
Unit Categories
12
Directives
12
Factory Test
12
Technical Data
12
Dimensions and Connections
15
Electrical Diagram
16
4 Description of the Product
17
General Description
17
Operating Principle
17
Gas/Air Regulation
17
Combustion
17
Control System
17
Control
18
Regulating the Water Temperature
18
Protection against Shortage of Water
18
Water Flow
18
Hydraulic Pressure Sensor
18
Air Pressure Differential Switch
18
Circulating Pump
19
Calorifier Connection
19
Cascade System
19
Main Components
19
Control Panel Description
19
Standard Delivery
20
Accessories and Options
20
5 Before Installation
21
Installation Regulations
21
Lifting Instruction
21
Choice of the Location
21
Type Plate
21
Location of the Boiler
22
Transport
22
Unpacking & Initial Preparation
23
6 Installation
24
General
24
Preparation
24
Positioning the Boiler
24
Hydraulic Connections
24
Rinsing the System
24
Connecting the Heating Circuit
25
Connecting the Expansion Vessel
25
Connecting the Condensate Drain Pipe
26
Gas Connection
26
Air Supply/Flue Gas Connections
26
Classification
27
Outlets
28
Material
28
Length of the Air and Flue Gas Pipes
29
Specific Air and Flue Gas Applications
31
Additional Guidelines
31
Connecting the Flue Gas Outlet and Air Supply
31
Electrical Connections
32
Recommendations
32
Control Unit
32
Assembly of the Control Panel
33
Connecting the Connection Box
34
Connection Options for the Standard PCB
35
Connecting a Pc/Laptop
38
Filling the Installation
38
Water Treatment
38
Filling the Siphon
39
Filling the System
39
7 Commissioning
40
Checklist before Commissioning
40
Preparing the Boiler for Commissioning
40
Gas Circuit
40
Hydraulic Circuit
40
Electrical Connections
40
Commissioning Procedure
40
Gas Settings
41
Adjusting to a Different Gas Type
41
Checking/Setting Combustion
41
Final Instructions
43
8 Operation
44
Use of the Control Panel
44
Shutdown
44
Frost Protection
44
9 Settings
45
Description of the User Level Parameters
45
Description of the Installer Level Parameters
45
Changing the Parameters
48
Reading out Measured Values
49
Reading out Current Values (Counters)
49
Reading out Current Values (Signals)
49
Status and Sub-Status
51
10 Maintenance
55
General
55
Maintenance Message
55
Resetting the Service Messages
55
Starting a New Service Interval
56
Standard Inspection and Maintenance Operations
56
Checking the Water Pressure
56
Checking the Water Quality
56
Checking the Ionisation Current
57
Checking the Flue Gas Discharge/Air Supply Connections
57
Checking the Combustion
57
Checking the PS Air Pressure Differential Switch
58
Checking the Automatic Air Vent
59
Checking the Burner and Cleaning the Heat Exchanger
60
Clean the Condensate Collector
61
10.3.10 Cleaning the Siphon
61
Specific Maintenance Work
61
Replacing the Ionisation/Ignition Electrode
62
Checking the Non-Return Valve
62
Reassembling the Boiler
63
11 Disposal
64
Removal/Recycling
64
12 Troubleshooting
65
Error Codes
65
Warning
65
Blocking
65
Lock-Out
68
Error Memory
72
13 Spare Parts
73
General
73
Parts
74
14 Appendix
75
Erp Information
75
Product Fiche
75
EC Declaration of Conformity
75
Checklist for Commissioning
76
Checklist for Annual Maintenance
77
5
Based on 1 rating
Ask a question
Give review
Questions and Answers:
Need help?
Do you have a question about the REMEHA Quinta Ace and is the answer not in the manual?
Ask a question
REMEHA Quinta Ace Specifications
General
Model
Quinta Ace
Category
Boiler
Installation
Wall-mounted
Boiler Type
Condensing
Warranty
2 years
Fuel Type
Natural Gas
NOx Emissions
Class 5
Related product manuals
REMEHA Quinta Ace 30
88 pages
REMEHA Quinta Ace 135
88 pages
REMEHA Quinta Ace 115
88 pages
REMEHA Quinta 45
64 pages
REMEHA Quinta 30
60 pages
REMEHA Quinta 115
68 pages
REMEHA Quinta Pro
88 pages
REMEHA Quinta Pro 30
88 pages
REMEHA Quinta Pro 90
96 pages
REMEHA Quinta Pro 45
88 pages
REMEHA Quinta Pro 65
88 pages
REMEHA Quinta Pro 115
88 pages