EasyManua.ls Logo

REMEHA Quinta Pro 90 - Service Manual

REMEHA Quinta Pro 90
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Great Britain
EN
Wall-hung gas condensing boilers
Quinta Pro 30 - 45 - 65 - 90 - 115
Installation and
Service Manual
123157-AA

Table of Contents

Other manuals for REMEHA Quinta Pro 90

Questions and Answers

  • A
    Anna BurnettSep 6, 2025
    How do I troubleshoot a short-circuited return temperature sensor in my REMEHA Quinta Pro 90 Boiler?
    • A
      amanda76Sep 6, 2025
      If the return temperature sensor is short-circuited in your REMEHA Boiler, check the wiring. Also, check that the sensors are operating correctly and replace the sensor if necessary.
  • T
    Tommy BrownAug 25, 2025
    How to fix REMEHA Boiler maximum flow temperature exceeded?
    • M
      Monica ThomasAug 25, 2025
      If the maximum flow temperature is exceeded in your REMEHA boiler, it could be due to no flow or insufficient flow. Check the flow (direction, pump, valves) and reasons for the heat demand.
  • B
    Billy CarterAug 25, 2025
    What to do if the water pressure is too low in my REMEHA Quinta Pro 90?
    • A
      amber04Aug 26, 2025
      If the water pressure is too low in your REMEHA Boiler, you should check the water pressure. Also, fill the boiler and the installation with water.
  • M
    Miss Alyssa GardnerSep 14, 2025
    How to fix return temperature sensor short circuit in REMEHA Quinta Pro 90 Boiler?
    • K
      Keith MaloneSep 14, 2025
      If the return temperature sensor is short circuited in your REMEHA Boiler, check the wiring for bad connections. Also, check that the sensors are operating correctly and that the sensor has been correctly fitted.
  • E
    Erica MartinSep 23, 2025
    What causes no release signal in REMEHA Quinta Pro 90?
    • J
      Joseph SnowSep 23, 2025
      If there is no release signal on your REMEHA Boiler, suppress the external cause if there is one. Check the parameters because there may be a parameter error. Also, check the wiring for bad connections.
  • M
    Madison CaseSep 10, 2025
    Why REMEHA Quinta Pro 90 heat exchanger temperature is too high?
    • T
      Terri RodriguezSep 10, 2025
      If the temperature of heat exchanger is too high in your REMEHA Boiler, check the wiring for bad connections. Also, check that the sensors are operating correctly and that the sensor has been correctly fitted. If there is no circulation, check the circulation (direction, pump, valves). You may also need to check the water pressure and the cleanliness of the heating body.
  • M
    Michelle MannSep 1, 2025
    How to fix REMEHA Boiler storage unit PSU parameter not found?
    • V
      vthompsonSep 2, 2025
      If the storage unit PSU parameter is not found in your REMEHA Boiler, the problem could be a bad connection. Check the wiring to resolve this issue.
  • C
    carlsonjohnSep 2, 2025
    What to do if there is no flame during operation in my REMEHA Boiler?
    • K
      Kelly BraySep 2, 2025
      If there's no flame during operation of your REMEHA Boiler, here's what you can check: * Vent the gas supply to remove any air. * Ensure the gas valve is fully opened and verify the gas supply pressure. * Check the operation and setting of the gas valve unit. * Make sure the air supply inlet and flue gas outlet are not blocked. * Ensure there is no recirculation of flue gases.
  • D
    Dr. Nicole Smith DVMSep 18, 2025
    Why shutdown input is active or frost protection is active in REMEHA Quinta Pro 90?
    • B
      Brenda GarciaSep 18, 2025
      If the shutdown input is active or frost protection is active on your REMEHA Boiler, check the wiring for bad connections. If there is an external cause, suppress the external cause. Also, check the parameters because there may be a parameter error.
  • R
    robertgarzaAug 28, 2025
    What to do if REMEHA Quinta Pro 90 Boiler shows communication error with the SCU PCB?
    • T
      Thomas ButlerAug 29, 2025
      If your REMEHA boiler shows a communication error with the SCU PCB, it may be due to a poor connection with the BUS or the SCU PCB not being present in the boiler. Check the wiring and carry out automatic detection.

Summary

EG Declaration of Conformity

1 Introduction

1.1 Used symbols

Explains symbols used for danger, warning, and caution.

1.4 Homologations

Details certifications, device categories, and directives for the boiler.

2 Safety instructions and recommendations

2.1 Safety instructions

Outlines critical safety precautions for gas and flue gases.

2.2 Recommendations

Provides advice on installation, maintenance, and appliance handling.

3 Technical description

3.1 General description

Overview of high-efficiency wall-hung condensing gas boilers.

3.2 Main parts

Identifies and labels the key components of the boiler.

3.3 Operating principle

Explains how the boiler functions, including pump operation.

4 Installation

4.1 Regulations governing installation

States the requirement for qualified professionals and adherence to regulations.

4.3 Choice of the location

Guidance on selecting an appropriate installation site for the boiler.

4.5 Hydraulic connections

Steps for connecting the boiler's water circuits.

4.4 Positioning the boiler

Instructions for mounting and hanging the boiler securely on the wall.

4.6 Gas connection

4.7 Connections for the air and exhaust pipes

Details on connecting ventilation and flue gas systems.

4.8 Electrical connections

Instructions for wiring the boiler to control systems and power.

5 Start-up

5.1 Control panel

Details the functions of the boiler's control panel and display symbols.

5.2 Check points before commissioning

Lists essential checks before putting the boiler into operation.

5.4 Gas settings

Procedures for adjusting gas type and air/gas ratio for optimal performance.

6 Switching off the appliance

6.1 Installation shutdown

Steps for safely switching off the boiler for long periods.

6.2 Antifreeze protection

Explains the boiler's frost protection features and precautions.

7 Checking and maintenance

7.2 Preventive maintenance with automated service message

Guides on performing preventive maintenance based on the service message.

7.3 Standard inspection and maintenance operations

Details routine checks and maintenance tasks for the boiler.

7.4 Specific maintenance operations

Covers additional maintenance tasks beyond standard inspections.

8 Troubleshooting

8.1 Error codes

Lists and explains error codes displayed by the boiler.

8.2 Shutdowns and lock-outs

Details boiler lockout conditions and their meanings.

8.3 Error memory

How to access and interpret the boiler's error log.

9 Spare parts

9.1 General

Guidelines for ordering and replacing boiler components.

REMEHA Quinta Pro 90 Specifications

General IconGeneral
MountingWall-mounted
Max Heat Output90 kW
FuelNatural Gas / LPG
Max working pressure6 bar
NOx class5

Related product manuals