EasyManua.ls Logo

REMEHA Quinta Pro 90 Service Manual

REMEHA Quinta Pro 90
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Great Britain
EN
Wall-hung gas condensing boilers
Quinta Pro 30 - 45 - 65 - 90 - 115
Installation and
Service Manual
123157-AA

Table of Contents

Other manuals for REMEHA Quinta Pro 90

Questions and Answers:

REMEHA Quinta Pro 90 Specifications

General IconGeneral
MountingWall-mounted
Max Heat Output90 kW
FuelNatural Gas / LPG
Max working pressure6 bar
NOx class5

Summary

EG Declaration of Conformity

1 Introduction

1.1 Used symbols

Explains symbols used for danger, warning, and caution.

1.4 Homologations

Details certifications, device categories, and directives for the boiler.

2 Safety instructions and recommendations

2.1 Safety instructions

Outlines critical safety precautions for gas and flue gases.

2.2 Recommendations

Provides advice on installation, maintenance, and appliance handling.

3 Technical description

3.1 General description

Overview of high-efficiency wall-hung condensing gas boilers.

3.2 Main parts

Identifies and labels the key components of the boiler.

3.3 Operating principle

Explains how the boiler functions, including pump operation.

4 Installation

4.1 Regulations governing installation

States the requirement for qualified professionals and adherence to regulations.

4.3 Choice of the location

Guidance on selecting an appropriate installation site for the boiler.

4.5 Hydraulic connections

Steps for connecting the boiler's water circuits.

4.4 Positioning the boiler

Instructions for mounting and hanging the boiler securely on the wall.

4.6 Gas connection

4.7 Connections for the air and exhaust pipes

Details on connecting ventilation and flue gas systems.

4.8 Electrical connections

Instructions for wiring the boiler to control systems and power.

5 Start-up

5.1 Control panel

Details the functions of the boiler's control panel and display symbols.

5.2 Check points before commissioning

Lists essential checks before putting the boiler into operation.

5.4 Gas settings

Procedures for adjusting gas type and air/gas ratio for optimal performance.

6 Switching off the appliance

6.1 Installation shutdown

Steps for safely switching off the boiler for long periods.

6.2 Antifreeze protection

Explains the boiler's frost protection features and precautions.

7 Checking and maintenance

7.2 Preventive maintenance with automated "service message"

Guides on performing preventive maintenance based on the service message.

7.3 Standard inspection and maintenance operations

Details routine checks and maintenance tasks for the boiler.

7.4 Specific maintenance operations

Covers additional maintenance tasks beyond standard inspections.

8 Troubleshooting

8.1 Error codes

Lists and explains error codes displayed by the boiler.

8.2 Shutdowns and lock-outs

Details boiler lockout conditions and their meanings.

8.3 Error memory

How to access and interpret the boiler's error log.

9 Spare parts

9.1 General

Guidelines for ordering and replacing boiler components.

Related product manuals