EasyManua.ls Logo

REMEHA Quinta Pro 115 - User Manual

REMEHA Quinta Pro 115
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
United Kingdom
en
Installation, user and service manual
Wall-hung gas condensing boilers
Quinta Pro
30 – 45 – 65 – 90 – 115

Table of Contents

Other manuals for REMEHA Quinta Pro 115

Questions and Answers

  • M
    Mark KingSep 6, 2025
    How do I troubleshoot a short-circuited return temperature sensor in my REMEHA Quinta Pro 115?
    • C
      Charles FreemanSep 6, 2025
      If the return temperature sensor is short-circuited in your REMEHA Boiler, check the wiring. Also, check that the sensors are operating correctly and replace the sensor if necessary.
  • L
    Lisa RiveraAug 25, 2025
    How to fix REMEHA Quinta Pro 115 maximum flow temperature exceeded?
    • J
      Jennifer LeeAug 25, 2025
      If the maximum flow temperature is exceeded in your REMEHA boiler, it could be due to no flow or insufficient flow. Check the flow (direction, pump, valves) and reasons for the heat demand.
  • J
    Jo StevensonAug 25, 2025
    What to do if the water pressure is too low in my REMEHA Boiler?
    • M
      Mary SimpsonAug 26, 2025
      If the water pressure is too low in your REMEHA Boiler, you should check the water pressure. Also, fill the boiler and the installation with water.
  • J
    Jessica SanchezSep 14, 2025
    How to fix return temperature sensor short circuit in REMEHA Quinta Pro 115 Boiler?
    • B
      Brittney NewtonSep 14, 2025
      If the return temperature sensor is short circuited in your REMEHA Boiler, check the wiring for bad connections. Also, check that the sensors are operating correctly and that the sensor has been correctly fitted.
  • W
    Whitney CarterSep 23, 2025
    What causes no release signal in REMEHA Quinta Pro 115 Boiler?
    • S
      stephen71Sep 23, 2025
      If there is no release signal on your REMEHA Boiler, suppress the external cause if there is one. Check the parameters because there may be a parameter error. Also, check the wiring for bad connections.
  • R
    Ryan HernandezSep 10, 2025
    Why REMEHA Boiler heat exchanger temperature is too high?
    • N
      Nicholas SanchezSep 10, 2025
      If the temperature of heat exchanger is too high in your REMEHA Boiler, check the wiring for bad connections. Also, check that the sensors are operating correctly and that the sensor has been correctly fitted. If there is no circulation, check the circulation (direction, pump, valves). You may also need to check the water pressure and the cleanliness of the heating body.
  • B
    Billy SingletonSep 1, 2025
    How to fix REMEHA Quinta Pro 115 storage unit PSU parameter not found?
    • H
      Holly HartSep 2, 2025
      If the storage unit PSU parameter is not found in your REMEHA Boiler, the problem could be a bad connection. Check the wiring to resolve this issue.
  • S
    Steven MontoyaSep 2, 2025
    What to do if there is no flame during operation in my REMEHA Quinta Pro 115?
    • R
      Rebecca ReevesSep 2, 2025
      If there's no flame during operation of your REMEHA Boiler, here's what you can check: * Vent the gas supply to remove any air. * Ensure the gas valve is fully opened and verify the gas supply pressure. * Check the operation and setting of the gas valve unit. * Make sure the air supply inlet and flue gas outlet are not blocked. * Ensure there is no recirculation of flue gases.
  • D
    Dennis JonesSep 18, 2025
    Why shutdown input is active or frost protection is active in REMEHA Quinta Pro 115 Boiler?
    • J
      Jamie PerezSep 18, 2025
      If the shutdown input is active or frost protection is active on your REMEHA Boiler, check the wiring for bad connections. If there is an external cause, suppress the external cause. Also, check the parameters because there may be a parameter error.
  • R
    Rachel FisherAug 28, 2025
    What to do if REMEHA Quinta Pro 115 Boiler shows communication error with the SCU PCB?
    • M
      melissa06Aug 28, 2025
      If your REMEHA boiler shows a communication error with the SCU PCB, it may be due to a poor connection with the BUS or the SCU PCB not being present in the boiler. Check the wiring and carry out automatic detection.

Summary

Safety

General Safety Instructions

Provides critical safety guidelines for installers and end-users regarding gas leaks, flue gases, and handling the appliance.

Recommendations

Offers advice on appliance usage, maintenance, spare parts, and general safety precautions for safe and efficient operation.

Liabilities

Outlines the responsibilities of the manufacturer, installer, and user concerning installation, maintenance, and operation of the boiler.

About This Manual

Symbols Used

Explains the various danger levels and symbols used throughout the manual to ensure user safety and proper appliance operation.

Afkortingen

Provides a list of abbreviations used in the manual, helping to clarify technical terms and acronyms.

Technical Specifications

Homologations

Details the certifications, NOx class, and connection types relevant to the boiler's compliance and installation standards.

Technical Data

Presents essential technical data including output, input, efficiency, gas, and electrical specifications for various boiler models.

Dimensions and Connections

Illustrates the physical dimensions and connection points for flue gas, air supply, water, and gas, crucial for installation.

Electrical Diagram

Provides a detailed schematic of the boiler's electrical system, including component identification and connections.

Description of the Product

General Description

Highlights the key features of the Quinta Pro boiler, such as high efficiency, low emissions, and suitability for cascade configurations.

Operating Principle

Explains the core functions, including circulating pump operation, cascade systems, water flow, and calorifier connection.

Main Components

Identifies and labels the principal internal and external components of the boiler for easy reference.

Control Panel Description

Details the functions of each key and the meaning of symbols displayed on the boiler's control panel for user interaction.

Standard Delivery

Lists the items included in the standard package delivered with the boiler, such as the unit, leads, and documentation.

Accessories and Options

Informs users about various optional accessories available for purchase to enhance the boiler's functionality.

Before Installation

Installation Regulations

Specifies mandatory regulations and qualifications for installers, including Gas Safe registration and ACS qualifications.

Choice of Location

Provides guidelines for selecting an appropriate installation site, considering space, access, and safety requirements.

Ventilation

Outlines the requirements for ventilation installations, referencing relevant British Standards for compliance.

Installation

General

States that the boiler must be installed by a qualified installer in accordance with local and national regulations.

Preparation

Covers the initial steps for installation, including positioning the boiler using the provided mounting template and bracket.

Water Connections

Details the process for connecting water circuits, including system rinsing, flow/return connections, and expansion vessel fitting.

Gas Connection

Provides instructions for making the gas connection, emphasizing safety checks and proper pipe fitting.

Air Supply;Flue Gas Connections

Explains the classification, outlets, materials, and length requirements for air supply and flue gas connection systems.

Electrical Connections

Guides the user through making electrical connections, including control unit details, recommendations, and access to connectors.

Filling the System

Describes the procedure for filling the boiler and heating system, including water treatment and siphon filling.

Commissioning

General

Outlines the steps for putting the boiler into operation, emphasizing adherence to procedures and safety warnings.

Gas Circuit

Details the process for checking the gas circuit, including gas valve unit measurements and pressure checks.

Hydraulic Circuit

Covers checks for the hydraulic circuit, ensuring the siphon is filled and water-side connections are tight.

Electrical Connections

Ensures that all electrical connections are checked prior to commissioning for proper operation.

Commissioning Procedure

Provides a step-by-step guide for the initial commissioning process, including safety warnings and procedure notes.

Gas Settings

Covers gas type adaptation and the critical procedure for checking and setting the gas/air ratio for optimal combustion.

Final Instructions

Lists the final steps after commissioning, including reassembly, system checks, user instruction, and manual handover.

Operation

Use of the Control Panel

Explains how to navigate and use the boiler's control panel to monitor status, view faults, and adjust settings.

Shutdown

Provides instructions for safely shutting down the boiler, including disconnecting power and gas supplies.

Frost Protection

Details the boiler's built-in frost protection system and how to enhance it with external sensors or thermostats.

Settings

Parameter Descriptions

Lists and describes all available parameters, their adjustment ranges, and factory default settings for various models.

Changing the Parameters

Explains how to modify user-level and installer-level parameters, including access codes and specific setting procedures.

Displaying the Measured Values

Guides the user on how to read various operational values, hour counters, and status indicators from the control panel.

Maintenance

General

Emphasizes the importance of periodic inspection and maintenance, highlighting the automatic service message system.

Service Message

Explains how service messages are displayed, how to reset them, and the procedure for starting a new service interval.

Standard Inspection and Maintenance Operations

Details routine checks and maintenance tasks, including water pressure, ionisation current, combustion, and component cleaning.

Specific Maintenance Work

Covers specialized maintenance tasks such as replacing the ionisation electrode and checking the non-return valve.

Troubleshooting

Error Codes

Provides a comprehensive list of error codes, their potential causes, and recommended solutions for diagnosing and resolving issues.

Error Memory

Explains how the boiler stores error history and the procedure for reading out and clearing the error memory.

Disposal

Removal;Recycling

Details the safe procedure for removing and disposing of the boiler, emphasizing qualified personnel and regulatory compliance.

Spare Parts

General

Advises on replacing defective parts exclusively with original or recommended parts and procedures for quality control.

Parts

Provides exploded views and part identification numbers for the Quinta Pro 30-45, 65, 90, and 115 models.

Appendix

ErP Information

Contains the product card and package sheet detailing energy efficiency ratings and related calculations for compliance.

EC Declaration of Conformity

Confirms that the unit complies with relevant European directives and standards for manufacturing and commissioning.

Optional Electrical Connections

Details connection options for various PCBs (SCU-S03, SCU-X02, SCU-X03, c-Mix) and their functionalities.

REMEHA Quinta Pro 115 Specifications

General IconGeneral
ModelQuinta Pro 115
TypeCondensing Boiler
Output115 kW
Max. Heat Output115 kW
Fuel TypeNatural gas, LPG
FuelNatural Gas or Propane

Related product manuals