Transport, scope of delivery, installation
17
Fig.
: Attaching the hoist
3.10 Installation of the machine
Fig.
: Locking the transport rollers
• Place the device on a firm surface.
Please refer to the “Technical Data” chapter for further parameters.
The device must be locked before it is put into operation.
• Press the locking lever (FH) of the two front rollers down.
3.11 Installation of the machine
Installation height: maximum 2000 m above sea level