EasyManua.ls Logo

Retsch PM400 - Installation of the Machine

Retsch PM400
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport, scope of delivery, installation
17
Fig.
5
: Attaching the hoist
3.10 Installation of the machine
Fig.
6
: Locking the transport rollers
Place the device on a firm surface.
Please refer to the “Technical Data” chapter for further parameters.
The device must be locked before it is put into operation.
Press the locking lever (FH) of the two front rollers down.
3.11 Installation of the machine
Installation height: maximum 2000 m above sea level
FH
31.5 inches
31.5 inches

Table of Contents

Other manuals for Retsch PM400

Related product manuals