EasyManuals Logo

Riello ALU 150 PRO power User Manual

Riello ALU 150 PRO power
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
INSTALLER
24
The boiler is delivered on a wooden pallet, suitably packed
and protected by a wooden crate. Its condition and compli-
ance with what was ordered must be checked immediately.
The specific characteristics of the product are indicated on
the outside: model, power, equipment, fuel type .If there is
a discrepancy between what was ordered and what was
received, immediately contact the local agent, warehouse
or sales service.
PRODUCT DELIVERY
OPENING
b If the installation involves a lot of moving (e.g.
to a rooftop or cellar utility room, etc.) DO NOT
REMOVE the protective wooden cage until
the boiler is at its place of installation (see the
“Handling” section on the next page).
- Remove the wooden crate (1)
- Remove the polystyrene edge protectors (2)
- Pull off the protective bag (3).
- Remove the four fixing brackets (6).
1 - Wooden crate
2 - Edge protectors
3 - Protective bag
4 - Boiler
5 - Pallet
6 - Fixing brackets
Material supplied in the bag inside the boiler:
- outdoor temperature sensor
- lifting eyebolts
- condensate siphon
- adjustable feet
b The packaging material must be carefully preserved
and, in any event, must not be abandoned, as it is a
source of potential danger.
b Keep the documentation envelope in a safe place.
Any copies requested from r may be charged
for.
5
6
3
4
2
1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Riello ALU 150 PRO power and is the answer not in the manual?

Riello ALU 150 PRO power Specifications

General IconGeneral
BrandRiello
ModelALU 150 PRO power
CategoryBoiler
LanguageEnglish

Related product manuals