EasyManuals Logo

Rinnai Neo Series User Manual

Rinnai Neo Series
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
20 | Neo operation guide: 11907-E 05-14
Commissioning
The installer must complete the installation and commissioning checklist below
and leave this guide with you. They must also instruct you in the use and care of the
Neo, and make sure you understand the safety instructions and operation of the
appliance.
The glass dress guard fitted to this appliance reduces the risk of fire and injury and no part
of it should be permanently removed.
Checklist
F Appliance positioned in a suitable location (clearances, mantels and surrounds etc.).
F Rinnai flue system installed and tested to ensure effective draw.
F Gas pressures checked and set.
F Burn media installed as per instructions.
F Glass dress guard fitted and customer advised not to remove.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
WARNING

Other manuals for Rinnai Neo Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai Neo Series and is the answer not in the manual?

Rinnai Neo Series Specifications

General IconGeneral
BrandRinnai
ModelNeo Series
CategoryIndoor Fireplace
LanguageEnglish

Related product manuals