33 Rinnai CVent
Final Checklist
□ Reference the Rinnai Water Heater Installaon
and Operaon Manual for proper installaon of
the Rinnai water heaters.
□ Clearances from the water heater unit are met.
□ Clearances from the exhaust terminaon(s) and
the combuson air terminaon(s) are met.
□ Ensure you have used the correct venng
products and that you have completely followed
the venng manufacturer’s installaon
instrucons and these installaon instrucons.
□ Verify that the vent system does not exceed the
maximum equivalent length allowed.
□ Verify that dip switch SW1 in DIPSW1 (tan
switches) has been adjusted to OFF posion in
each water heater.
□ Explain to the customer the importance of not
blocking the vent terminaon or air intake.
□ Explain to the customer the operaon of the
water heater, safety guidelines, maintenance, and
warranty.
□ The installaon must conform with local codes or,
in the absence of local codes, with the
Naonal
Fuel Gas Code, ANSI Z223.1/NFPA 54
, or the
Natural Gas and Propane Installaon Code, CSA
B149.1
.
□ Inform the consumer if the isolaon valves are
not installed or if a water soening system is not
installed.
□ Verify that only models RU98i (REU-KB3237FFUD-
US), RUC98i (REU-KBD3237FFUD-US), or C199i
(REU-KBD3237FFUDC-US) are using the common
vent system.
□ If an MSB system is present verify that it is
properly installed per the Rinnai installaons and
that all cables are connected and dip switches are
appropriately set.
□ Verify that the appropriate amount of
combuson air has been provided.
□ Verify the appropriate dip switch sengs are
selected for the altude/elevaon of the
installaon locaon.
□ Verify that in room air applicaons that exhaust
is terminang vercally
□ Room air is only for C199i in Commercial
Common Vent Applicaons
□ Leave this manual taped to one of the water
heaters or give the enre manual directly to the
consumer.