EasyManuals Logo

Rinnai RU98i User Manual

Rinnai RU98i
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
40 Rinnai CVent
A10 Final Installation Check List
All vent components are secure and fully engaged.
All seals are correctly positioned and included at every joint.
All exhaust vent runs include a minimum of a 3° incline (3/4” per ft or 5.6cm/m)
All Condensate drains tubes are connected to a drain and comply with local code.
All condensate traps have been primed.
There are no obstructions in the combustion air or exhaust vent runs.
Both intake and exhaust terminations are appropriately positioned and comply with the manu-
facturers installation instructions and local codes.
The CVent Common Vent System Installation Instructions and the Appliance Installation In-
structions have been secured to the system or provided to the end user.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai RU98i and is the answer not in the manual?

Rinnai RU98i Specifications

General IconGeneral
BrandRinnai
ModelRU98i
CategoryWater Heater
LanguageEnglish

Related product manuals