EasyManua.ls Logo

RITROX RX1102 - Page 10

RITROX RX1102
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
5. Make sure that there is a minimum clearance of 2.5cm between the gate and the opener and that the opener
and the Post Pivot Bracket are not binding in both the gate-open and gate-closed positions. If there is not at least
2.5cm of clearance or if the opener and the Post Pivot Bracket are binding, rotate the Post Pivot Bracket and/or
move the Post Bracket Assembly to obtain the minimum clearance and eliminate the binding. When the minimum
clearance has been obtained and any binding has been eliminated, place the M8 x 30 bolt through the aligned
holes in the Post Bracket and the Post Pivot Bracket.