EasyManua.ls Logo

Rocket Espresso R9V - Transport and Installation; Packaging, Handling and Transport

Rocket Espresso R9V
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
R9V
2 - TRANSPORT AND
INSTALLATION
The machine installation per-
sonnel must, before proceeding,
read these instructions and, in
particular, the previous sections
regarding general information and
safety requirements. Installation
must be carried out by specialised
personnel.
MACHINE
UNDER
MAINTENANCE
i
The machine is supplied completely assem-
bled (except for the accessories contained in a
special box) in a cardboard packaging placed
on a pallet. (g. 2.1).
2.1 Packaging, handling and
transport
The weigh of the unladen machine is indicated
directly on the packaging or is visible through
it, on the “CE” marking plate applied on the
machine.
The packed machine must be protected in a
sheltered and moisture-free premises until it
is installed in a suitable environment.
After the removal of the packaging, it is nec-
essary to verify that the various components
are in perfect condition and that there are no
g_2.1
traces of tampering, damaged parts, etc.
It will also be necessary to check that the
machine is complete with all its parts, any
accessories and technical documentation as
per the transport documentation.
CAUTION! Before proceeding
with the installation, in case
anomalies are found in the
checks on delivery, report the
ndings to the manufacturer.
Pictograms on the packaging
MACHINE
UNDER
MAINTENANCE
i
Center of gravity
Protect from humidity
Coupling point
Handle with care
Up
CE marking
CAUTION! Before proceeding
with the installation, in case
anomalies are found in the checks
on delivery, report the ndings to
the manufacturer.
MACHINE
UNDER
MAINTENANCE
i

Related product manuals