Symbols on components
During the (re)commissioning of the pool cover, the ‘ZU’ (OPEN) and ‘ZU’ (CLOSED) end
positions of the swimming pool system must be monitored and adjusted if necessary in
accordance with these operating instructions.
The distribution box must be installed and must be freely accessible at all times on the
edge of the pool; any deviations in the installation are prohibited! The length of the
conduit between the drive and distribution box should be max. 3.5 m.
Switch off the power supply prior to any work on electrical components (controller,
motor, switches)! Electrical connection work may only be carried out by a qualified,
skilled electrician.