11
Attach hose to column
using 3/8"-16NC x 3/4"
Carriage Bolts, Flanged
Locknuts, and Hose Clips
Sheave Cover
Fig. 9b
1 1
2
6
4
6
FRONT
Hose runs down
approach side to
cylinder on left column.
Cylinder bleeders
Torque values
15 ft. lbs. Minimum
20 ft. lbs. Maximum
6
5
3
3
5
*
*
*
*
**
##
# #
NOTE: Overhead hose crosses and runs down
approach side of left column to cylinder.
ITEM QTY. DESCRIPTION
1 2 Hydraulic Cylinder
2 1 Power Unit Hose
3 1 Overhead Hose
4 1 Branch Tee
5 2 Metal Hose Clips
6 8 Plastic Hose Clips
*6 3/8-16NC x 3/4” lg. Carriage Bolts
*6 3/8”-16NC Flanged Locknuts
#4 3/8-16NC x 3/4” lg. Flanged HHCS
#4 3/8”-16NC Flanged Locknuts
Fig. 9a
Fig. 10b
1st Cable
2nd Cable
Upper Sheaves
Lower Sheaves
Fig. 10a
Upper Cable Tie Off
& 5/8" Nylon Insert
Locknut
Lower Cable Tie Off
& 5/8" Nylon Insert
Locknut
3/4"(19mm)
SCHEDULE 80
steel pipe spacer
for Low Ceiling
To set up cables for a low
ceiling(LC), use 3/4" SCH
80 steel pipe spacers (not
included) at the lower
cable tie off. The lengths
required are as follows:
4" Lower Height = 8"
(203mm) long pipe
8-1/2" Lower Height = 17"
(432mm) long pipe