EasyManua.ls Logo

Rotary SPO12 Standard - Page 11

Rotary SPO12 Standard
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Attach hose to column
using 3/8"-16NC x 3/4"
Carriage Bolts, Flanged
Locknuts, and Hose Clips
Sheave Cover
Fig. 9b
1 1
2
6
4
6
FRONT
Hose runs down
approach side to
cylinder on left column.
Cylinder bleeders
Torque values
15 ft. lbs. Minimum
20 ft. lbs. Maximum
6
5
3
3
5
*
*
*
*
**
##
# #
NOTE: Overhead hose crosses and runs down
approach side of left column to cylinder.
ITEM QTY. DESCRIPTION
1 2 Hydraulic Cylinder
2 1 Power Unit Hose
3 1 Overhead Hose
4 1 Branch Tee
5 2 Metal Hose Clips
6 8 Plastic Hose Clips
*6 3/8-16NC x 3/4” lg. Carriage Bolts
*6 3/8”-16NC Flanged Locknuts
#4 3/8-16NC x 3/4” lg. Flanged HHCS
#4 3/8”-16NC Flanged Locknuts
Fig. 9a
Fig. 10b
1st Cable
2nd Cable
Upper Sheaves
Lower Sheaves
Fig. 10a
Upper Cable Tie Off
& 5/8" Nylon Insert
Locknut
Lower Cable Tie Off
& 5/8" Nylon Insert
Locknut
3/4"(19mm)
SCHEDULE 80
steel pipe spacer
for Low Ceiling
To set up cables for a low
ceiling(LC), use 3/4" SCH
80 steel pipe spacers (not
included) at the lower
cable tie off. The lengths
required are as follows:
4" Lower Height = 8"
(203mm) long pipe
8-1/2" Lower Height = 17"
(432mm) long pipe

Related product manuals